PROJECT DOSSIER

Greenfield Extraction Facility

Greenfield Extraction Facility

Greenfield Extraction Facility

Developed advanced industrial ventilation and aspiration systems as Senior HVAC Engineer. Implemented technical building audits, executed formal CQ (Commissioning and Qualification), and generated comprehensive SOPs for the facility

Pharmaceutical lab placeholder

Detailed Engineering Delivery

Leading the technical design and field coordination for a major agricultural processing and lecithin production plant. The primary engineering focus involved designing heavy industrial ventilation and complex aspiration networks to handle hazardous processing byproducts. Conducting thorough technical building audits ensured constructability before execution. The project culminated in executing formal Commissioning and Qualification (CQ) protocols and developing clear Standard Operating Procedures (SOPs) to ensure long-term equipment reliability

ROLE / TITLE

Senior HVAC Engineer

PROJECT PROFILE

Sector

MEP/Civil

Year

2015-2017

CAPEX

Confidential CAPEX package

TECHNICAL NORMS / STANDARDS

INDUSTRIAL VENTILATION, CQ, SOPS, TECHNICAL AUDIT