PROJECT DOSSIER

Massive-Scale Logistics Hub

Massive-Scale Logistics Hub

Massive-Scale Logistics Hub

Developed comprehensive 3D Revit models as Senior HVAC Engineer for a 29,000+ sq.m. facility in Brovary. Streamlined the full engineering lifecycle from initial conceptualization through to successful operational handover and commissioning

Industrial production utilities placeholder

Detailed Engineering Delivery

Leading the mechanical engineering scope for a massive 29,000+ square meter warehousing and distribution center. The role demanded full-cycle 3D BIM design utilizing Autodesk Revit to ensure flawless integration between civil structures and sprawling MEP networks. Coordinating directly with structural engineers and managing the detailed execution documentation ensured that all climate control and ventilation systems met rigorous international warehousing standards up to the final handover

ROLE / TITLE

Senior HVAC Engineer

PROJECT PROFILE

Sector

MEP/Civil

Year

2019

CAPEX

Confidential CAPEX package

TECHNICAL NORMS / STANDARDS

REVIT 3D, END-TO-END DELIVERY, HVAC DESIGN, SMOKE EXTRACTION